Infrastructure

null

Warsaw

More than 11 buildings – 30,000 m², including 4 hangars.

Hangar 1

  • One maintenance slot

  • Dock equipped for aircraft washing and painting

  • Area – 2,884 m²

  • Access to 60,000 m² of apron space

Hangar 2

  • One maintenance slot for Boeing B767 or three maintenance slots for Embraer 170/190

  • Area – 3,805 m²

  • Access to 60,000 m² of apron space

Hangar 3

  • Three maintenance slots

  • Area – 2,884 m²

  • Access to 60,000 m² of apron space

Hangar 4

  • Five maintenance slots

  • Dock prepared for base maintenance of Boeing B737 and Embraer 170/190

  • Area – 8,028 m²

  • Access to 60,000 m² of apron space

null

Rzeszów (RZE1)

Operational since 11.2024

Hangar 1

  • Four maintenance slots

  • Docking system

  • 1 slot available for B787-8/9/10 or for 4 x B737- CL/NG/MAX

  • Area – 6,740 m²

Hangar 2

  • Two maintenance slots

  • Docking system

  • 1 slot available for 737 - CL/NG/MAX

  • Area – 2,718 m²

Rzeszów (RZE2)

Planned start of operations – 2026

Hangar 1

  • Two maintenance slots for B787-8/9/10 and one for B737 NG/MAX

  • Hangar area: 11,776 m²

  • Access to 25,968 m² of apron space

nullnull